No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. JAVA DESAIN CONSULTAN - 75.545.223.2-517.000 | 65,0 | 54,94 | Rp. 300.960.000,00 |
Rp. 300.960.000,00 |
Rp. 300.960.000,00 | 20,0 | 74,94 | |||||||||
2 | CV. ARTHA GEMILANG ENGINEERING - 01.848.791.8-503.000 | 65,0 | 62,8 | Rp. 328.405.000,00 |
Rp. 328.405.000,00 |
Rp. 323.097.500,00 | 18,33 | 81,13 | |||||||||
3 | CV. Madani Callysta Saibuyun - 02.265.266.3-541.000 | 75,0 | 61,6 | Rp. 342.496.000,00 |
Rp. 342.496.000,00 |
Rp. 342.496.000,00 | 17,57 | 79,17 | |||||||||
4 | CV. AECON - 66.235.935.5-517.000 | 60,0 | Nilai Kualifikasi dibawah passing grade yang ditentukan yaitu 65 | ||||||||||||||
5 | CV. Greenterra Mapindo - 72.215.009.1-543.000 | ||||||||||||||||
6 | PT. MANGISI MAKMUR SENTOSA - 01.394.456.4-011.000 | ||||||||||||||||
7 | PT. SMARTINDO PRIMA SISTEM - 31.672.243.8-015.000 | ||||||||||||||||
8 | Sistem Fisik Siber - 86.380.049.6-801.000 | ||||||||||||||||
9 | CV GEOMELANGE - 72.139.721.4-523.000 | ||||||||||||||||
10 | PT.CIPTA EKAPURNA ENGINEERING CONSULTANT - 01.464.352.2-542.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak