No | Nama Peserta | K | B | A | T | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | BIMA AGUNG - 01.724.090.4-509.000 | Rp. 29.623.624.554,70 |
Rp. 29.623.624.554,70 |
||||||||
2 | PT. BUMI SELATAN PERKASA - 01.513.583.3-915.000 | Rp. 29.896.484.420,00 |
Rp. 29.896.484.420,00 |
||||||||
3 | PT. Panca Karya Sentosa - 21.016.341.6-522.000 | Rp. 30.922.229.265,96 |
Rp. 30.922.229.265,96 |
||||||||
4 | PT. MITRA PESONA SAMUDRA - 03.149.746.4-722.000 | |
|
||||||||
5 | KURNIA DARMA PUTRA - 01.444.344.4-528.000 | |
|
||||||||
6 | PT. SUBASUMI CIPTA SENAWIRA - 02.771.587.9-515.000 | |
|
||||||||
7 | PT. WASIS KARYA NUGRAHA - 21.023.285.6-543.000 | |
|
||||||||
8 | AGCIRAN TEKNIK - 31.762.475.7-412.000 | Rp. 31.989.426.558,97 |
Rp. 31.989.426.558,97 |
||||||||
9 | PT. HIKMAH KURNIA - 01.606.301.8-533.000 | |
|
||||||||
10 | PT. KARYA ADI KENCANA - 01.875.100.8-523.000 | Rp. 27.434.232.119,02 |
Rp. 27.434.232.119,02 |
Metode Pelaksanaan : Divisi 2 Drainase : saluran bentuk U Tipe DS3A (dengan tutup) dan, bahan poros untuk bahan penyaring (filter) tidak diuraikan; Divisi 3 Pekerjaan tanah dan geosintetik (selain MPPU) tidak diuraikan; Divisi 5 Pekerasan berbutir dan perkerasan beton semen (selain MPPU) tidak diuraikan; Divisi 6 Perkerasan aspal (selain MPPU) tidak diuraikan; Divisi 7 Struktur : pipa drainase menggunakan pipa baja dengan diameter 100 mm (MPPU) dan selain MPPU tidak diuraikan; Tidak melampirkan kebutuhan peralatan utama; Tidak melampirkan personil manajerial | |||||||
11 | PT. KALAPA SATANGKAL MAKMUR SEJAHTERA - 21.146.460.7-442.000 | Rp. 30.103.787.720,52 |
Rp. 30.103.787.720,52 |
Struktur organisasi dan uraian tugas masing-masing personil manajerial tidak ada; Pemeriksaan dan serah terima pekerjaan pertama (PHO) tidak diuraikan; Pemeriksaan dan serah terima pekerjaan kedua (FHO) tidak diuraikan; Bukti kepemilikan Concrete Batching Plant tidak ada, hanya ijin usaha; RKK tidak diketahui penanggung jawab teknis | |||||||
12 | PT. MITRA ANDALAN SAKTI - 02.715.216.4-331.000 | Rp. 29.500.000.929,30 |
Rp. 29.500.000.929,30 |
Metode Pelaksanaan : Divisi 2 : bahan porous untuk bahan penyaring tidak ada; Divisi 3 : geotekstil stabilisator (kelas 1), galian perkerasan berbutir tidak ada; Divisi 5 : lapis pondasi agregat kelas B, lapis pondasi agregat kelas S dan lapois pondasi agregat semen kelas A (cement treated base=CTB) tidak ada; Divisi 6 : lapis resap pengikat – aspal cair/emulsi tidak ada; Divisi 7 : pekerjaan beton struktur fc 20 MPa, pengujian keutuhan tiang dengan pile integrated test (PIT), pasangan batu dan bronjong dengan kawat yang dilapisi galvanis, papan nama jembatan tidak ada; Divisi 9 : patok pengarah, rel pengaman, kerb pracetak jenis 1 (peninggi/mountable), perkerasan blok beton pada trotoar dan median tidak ada; Divisi 10 : pengecatan sederhana/elemen beton, perbaikan sambungan siar muai & perbaikan sandaran tidak ada. | |||||||
13 | PT NAZA SENTOSA JAYA - 31.456.465.9-507.000 | Rp. 29.215.377.826,01 |
Rp. 29.215.377.826,01 |
Personil manajerial atas nama Farisal, ST tidak melampirkan SKA Ahli Teknik Jembatan, surat pernyataan personil manajerial atas nama Jefvi Thony Anstoni, Amd dalam surat pernyataan menyatakan sebagai tenaga quality bukan sebagai petugas K3; Tidak melampirkan pekerjaan yang disubkontrakkan. | |||||||
14 | PT. UNGGUL PERDANA MULYA - 01.330.637.8-012.000 | Rp. 27.329.067.999,99 |
Rp. 27.329.067.999,99 |
Metode pelaksanaan : Perletakan elastomerik sintetis ukuran 400 mm x 450 mm x 45 mm tidak sesuai dengan dokumen yang menggunakan dimensi 400 mm x 450 mm x 60 mm; galian perkerasan berbutir tidak ada; Bukti perjanjian sewa tidak melampirkan bukti kepemilikan dari pemilik alat; Subkon bukan pekerjaan utama : tidak sesuai dengan dokumen pemliihan | |||||||
15 | PT. SEMARANG MULTI CONS - 02.204.611.4-511.000 | Rp. 25.562.729.452,11 di bawah 80% Nilai HPS |
Rp. 25.562.729.452,11 di bawah 80% Nilai HPS |
Dari hasil klarifikasi dengan Pejabat Pembuat Komitmen pada Bidang Bina Marga Kegiatan Peningkatan Jembatan dan Gorong-gorong pada Dinas PU perumahan dan Kawasan Permukiman Kabupaten Sleman, Referensi / Surat Keterangan Pengalaman Kerja Personil Manajerial atas nama Sa’dullah, ST, Bayu Priyantman dan Ir. R Harjito tidak sesuai dengan posisi pada surat keterangan pengalaman kerja. | |||||||
16 | PT. DWI MULYO LESTARI - 01.234.721.7-621.000 | Rp. 25.847.335.975,18 di bawah 80% Nilai HPS |
Rp. 25.847.335.975,18 di bawah 80% Nilai HPS |
Perjanjian sewa alat (truck mixer) untuk paket pekerjaan lain (penggantian jembatan blandongan), RKK tidak diketahui oleh Penanggungjawab Teknis | |||||||
17 | PT. SARI MAS INDAH SEJAHTERA - 82.411.774.1-517.000 | Rp. 25.000.000.000,80 di bawah 80% Nilai HPS |
Rp. 25.000.000.000,80 di bawah 80% Nilai HPS |
Metode Pelaksanaan : Divisi 3 Pekerjaan tanah dan geosintetik : tidak diuraikan secara menyeluruh setiap jenis kegiatan; Divisi 7 Pekerjaan struktur : pipa drainase baja diameter 150 mm, tiang bor beton diameter 1000 mm tidak diuraiakan; Divisi 2 Drainase : bahan porous untuk bahan penyaring (filter) tidak diuraiakan; Divisi 9 Pekerjaan harian dan pekerjaan lain-lain : unit lampu penerangan jalan lengan tunggal type LED tidak diuraikan; Bukti kepemilikan alat dari PT. SCG READYMIX INDONESIA yang terdiri dari : Batching Plant & Truck Mixer tidak ada; Referensi kerja personil manajerial atas nama Wahju Widijatmoko, ST pada tahun 2018 tidak ada | |||||||
18 | PT. SEMPALAN JATI - 02.679.846.2-506.000 | Rp. 28.732.454.173,27 |
Rp. 28.732.454.173,27 |
Metode Pelaksanaan : Divisi 7 : PEMANCANGAN TIANG PANCANG DIA. 50 CM PANJANG 12 DAN 14 METER menggunakan Tiang Pancang 30x30 cm, tiang bor beton diameter 1000 mm tidak ada; uraian Divisi 2 : bahan porous untuk bahan penyaring (filter) tidak ada; Divisi 9 : dump truck 3-4 m3 tidak ada, mesin pengaduk (molen) 0,3 – 0,6 m3 tidak ada & jeck hammer tidak ada; Tidak menyampaikan daftar pekerjaan yang disubkontrakkan | |||||||
19 | PT. PITOYO PUTRA AJI JAYA - 02.984.721.7-522.000 | |
|
||||||||
20 | PT. PANCADARMA PUSPAWIRA - 01.139.910.2-526.000 | |
|
||||||||
21 | PT. PONCOREDJO - 01.216.847.2-526.000 | |
|
||||||||
22 | PT. KARTIKA JATI SENTOSA - 02.513.774.6-525.000 | |
|
||||||||
23 | PT. KANDHI ARTHA ABADI - 01.444.378.2-526.000 | |
|
||||||||
24 | PT. Aura Jagat Mandiri - 31.644.843.0-009.000 | |
|
||||||||
25 | CV. PUTRA BERLIAN - 70.608.212.0-528.000 | |
|
||||||||
26 | METAL GROUP CONSTRUCTION - 85.077.741.8-517.000 | |
|
||||||||
27 | KARTIKA - 02.513.868.6-532.000 | |
|
||||||||
28 | CV. HADE 18 - 31.476.805.2-528.000 | |
|
||||||||
29 | PT. MOHANDAS OELOENG - 01.220.761.9-511.000 | |
|
||||||||
30 | PT. SCG Pipe and Precast Indonesia - 01.824.566.2-052.000 | |
|
||||||||
31 | PT DUTA SINAR KENCANA - 21.002.486.5-527.000 | |
|
||||||||
32 | CV. KEMBAR SEJAHTERA - 02.799.165.2-508.000 | |
|
||||||||
33 | TIRTA AGUNG - 02.583.260.1-517.000 | |
|
||||||||
34 | PT. ANEKA BANGUN SARANA - 01.875.099.2-523.000 | |
|
||||||||
35 | PT. GLOBAL REKAYASA KONSULTAN - 83.349.004.8-101.000 | |
|
||||||||
36 | CV. SURYATAMA WAHYU ABADI - 02.253.483.8-505.000 | |
|
||||||||
37 | PT. SUMBER ARTHA DWIJAYA - 74.032.417.3-533.000 | |
|
||||||||
38 | CV. BINA PERSADA - 71.776.306.4-514.000 | |
|
||||||||
39 | ANUGRAH BANGUNUSA - 90.248.510.1-517.000 | |
|
||||||||
40 | PT SERBA GUNA MULIATAMA - 01.247.213.0-523.000 | |
|
||||||||
41 | PT. Bangun Karya Artha Lestari - 74.466.093.7-048.000 | |
|
||||||||
42 | Surya Jaya Indo Sukses - 84.085.049.9-514.000 | |
|
||||||||
43 | PT.PILAR PERSADA KONSTRUKSI - 71.132.322.0-514.000 | |
|
||||||||
44 | CV. ANDALAN ABADI - 03.057.801.7-647.000 | |
|
||||||||
45 | PT. BAHTERA DUNIA PRATAMA - 02.790.785.6-428.000 | |
|
||||||||
46 | PT.BHAKTI TAMA PERSADA - 03.199.255.5-648.000 | |
|
||||||||
47 | PT. PANEN ISHI CONS - 21.028.247.1-514.000 | |
|
||||||||
48 | CV. BERUANG BANYAK SEKALI - 01.244.318.0-518.000 | |
|
||||||||
49 | PT.SUMBER WIJAYA SAKTI MGL - 81.229.948.5-524.000 | |
|
||||||||
50 | PT. BAHANA MAKMUR UTAMA - 02.298.737.4-518.000 | |
|
||||||||
51 | PT CITRA CIPTAADIGUNA - 01.551.609.9-503.000 | |
|
||||||||
52 | PT. DIAN MOSESA PERKASA - 31.660.849.6-941.000 | |
|
||||||||
53 | PT. Satya Cipta Perkasa - 01.649.244.9-503.000 | |
|
||||||||
54 | PT. Citra Anak Bangsa - 31.161.848.2-517.000 | |
|
||||||||
55 | PT. ASTHA SAKA - 01.224.347.3-511.000 | |
|
||||||||
56 | PT. KARYA MULIA MANDIRI - 02.196.894.6-722.000 | |
|
||||||||
57 | PT. FANIDITA SARANA - 02.774.871.4-518.000 | |
|
||||||||
58 | PT. CAKRA WIGUNA BUANA - 72.027.456.2-542.000 | |
|
||||||||
59 | PT. SAKA INTAN ANDALAN PERKASA - 75.165.599.4-518.000 | |
|
||||||||
60 | PT DIKRIE JAYA GEMILANG - 70.258.300.6-442.000 | |
|
||||||||
61 | PT. BERUANG BANYAK SEKALI - 84.859.463.6-512.000 | |
|
||||||||
62 | PT. PUTRA MAS INDAH BAROE - 72.946.908.0-517.000 | |
|
||||||||
63 | Tanjung Bangun Persada - 31.285.487.0-501.000 | |
|
||||||||
64 | PT.SUNDUS KARYA PERDANA - 74.956.237.7-523.000 | |
|
||||||||
65 | MATAHARI - 02.071.794.8-516.000 | |
|
||||||||
66 | PT. MUTIARA ELWAN PERKASA - 83.812.703.3-528.000 | |
|
||||||||
67 | PT.MARGA KARYA - 02.324.727.3-507.000 | |
|
||||||||
68 | ARYA DUTA - 02.581.028.4-528.000 | |
|
||||||||
69 | PT.IKHTIAR MULIA KONSTRUKSI - 03.329.837.3-216.000 | |
|
||||||||
70 | PT BEJO LUMINTU MINULYO - 81.925.185.1-545.000 | |
|
||||||||
71 | PT. GADING KENCANA MULYA - 02.391.919.4-617.000 | |
|
||||||||
72 | PT KADI INTERNATIONAL - 01.001.704.4-059.000 | |
|
||||||||
73 | PT.NUSA BHAKTI WIRATAMA - 01.256.600.6-514.000 | |
|
||||||||
74 | PT. MATA AIR ABADI - 31.504.489.1-501.000 | |
|
||||||||
75 | PT. GEONIKA UTAMAPERDANA - 01.724.123.3-504.000 | |
|
||||||||
76 | PT. KARYAJATI TATA MANDIRI - 01.216.813.4-532.000 | |
|
||||||||
77 | PT. TANGGUL JAYA - 01.202.459.2-526.000 | |
|
||||||||
78 | PT. AGUNG DARMA INTRA - 01.149.777.3-526.000 | |
|
||||||||
79 | PT. WIBOWO PERKASA - 01.496.938.0-508.000 | |
|
||||||||
80 | CV. SAUDARA MANUNGGAL ABADI - 84.478.635.0-505.000 | |
|
||||||||
81 | PT. INTI SARI MURNI - 83.400.875.7-507.000 | |
|
||||||||
82 | PT. ARISTA KARYA JAYA - 02.656.301.5-515.000 | |
|
||||||||
83 | PT. GALA TAMA - 01.106.782.4-511.000 | |
|
||||||||
84 | BARA FUROT NAGATA, PT. - 02.530.114.4-529.000 | |
|
||||||||
85 | PT. HARTONO SARANA BANGUN CIPTA - 01.107.757.5-501.000 | |
|
||||||||
86 | PT LESTARI JAYA KONSTRUKSNDO - 90.180.531.7-505.000 | |
|
||||||||
87 | PT. Waagner Biro Indonesia - 01.071.618.1-058.000 | |
|
||||||||
88 | PT. Kokoh Contractor Indonesia - 02.415.303.3-031.000 | |
|
||||||||
89 | PT.Graha Seta - 02.645.376.1-543.000 | |
|
||||||||
90 | PT. GAFFARI SUMBER REJEKI - 01.885.357.2-008.000 | |
|
||||||||
91 | CV. ADHI BERKAH UTAMA - 76.714.157.5-506.000 | |
|
||||||||
92 | CV.SANTIADJI LANGGENG - 31.598.089.6-609.000 | |
|
||||||||
93 | PT. BUANA KONTRINDO CEMERLANG - 31.723.389.8-034.000 | |
|
||||||||
94 | CV. KARYA LESTARI - 01.202.176.2-514.000 | |
|
||||||||
95 | PT. WAHYU UTOMO PERSADA - 02.014.393.9-526.000 | |
|
||||||||
96 | CV. SARANA MULIA - 66.769.161.2-514.000 | |
|
||||||||
97 | PT. SAMODRA MEGA TEHNIKA - 01.245.912.9-527.000 | |
|
||||||||
98 | pt nurcahya jaya mandiri - 02.771.968.1-515.000 | |
|
||||||||
99 | PT.SURYA BUANA & SON - 01.122.607.3-602.000 | |
|
||||||||
100 | CV. AQILA SUKSES MANDIRI - 03.209.420.3-503.000 | |
|
||||||||
101 | CV. NUSA INDAH - 01.752.168.3-528.000 | |
|
||||||||
102 | CV. KALINANG - 86.686.281.6-514.000 | |
|
||||||||
103 | PT. ARSITEKTONIK TAJUK REKAYASA - 01.594.729.4-518.000 | |
|
||||||||
104 | CV CATUR MANUNGGAL - 90.650.046.7-528.000 | |
|
||||||||
105 | PT. DWI PONGGO SETO - 01.454.500.8-641.000 | |
|
||||||||
106 | pt. buana karya wiratama - 02.237.138.9-734.000 | |
|
||||||||
107 | PT. Soyuren Indonesia - 21.135.993.0-542.000 | |
|
||||||||
108 | PT. MULTISARANA CIPTA KONSTRUKSI - 90.100.479.6-618.000 | |
|
||||||||
109 | CV. EMMASINDO - 31.263.189.8-075.000 | |
|
||||||||
110 | CV. Anugrah Rizki Barokah - 71.791.304.0-506.000 | |
|
||||||||
111 | CV WICAKSONO ABADI WULANTAMA - 80.681.122.0-531.000 | |
|
||||||||
112 | PT.KARYA SETIA NUSANTARA - 74.899.116.3-502.000 | |
|
||||||||
113 | PT. PRAJA GHUPTA UTAMA - 01.936.710.1-016.000 | |
|
||||||||
114 | BUMI SARANA MAKMUR - 01.146.735.4-508.000 | |
|
||||||||
115 | PT. SEMPALAN TEKNOLOGI NASIONAL - 02.518.055.5-506.000 | |
|
||||||||
116 | MANDIRI HARAPAN UTAMA, PT - 03.308.465.8-201.000 | |
|
||||||||
117 | PT. MULTIKARYA PERKASA MANDIRI - 90.254.194.5-604.000 | |
|
||||||||
118 | CV. AMARTHA PERSADA - 81.938.874.5-517.000 | |
|
||||||||
119 | PERDANA - 01.897.381.8-532.000 | |
|
||||||||
120 | PT. WIRA KARSA KONSTRUKSI - 02.821.626.5-805.000 | |
|
||||||||
121 | CV. DWI TUNGGAL - 01.133.522.1-612.000 | |
|
||||||||
122 | PT. Nusantara Baja Prima - 71.097.566.5-011.000 | |
|
||||||||
123 | JAYA - 01.207.932.3-533.000 | |
|
||||||||
124 | cv. cahya nugraha - 31.473.123.3-522.000 | |
|
||||||||
125 | PT. RIZKY CIPTA GUNA PERKASA - 02.521.424.8-425.000 | |
|
||||||||
126 | PT. WIJOKSONO JAYA SAKTI - 31.509.619.8-445.000 | |
|
||||||||
127 | PT PRATAMA MUDA JAYA - 85.454.760.1-527.000 | |
|
||||||||
128 | PT Jala Karya Putra - 71.528.138.2-648.000 | |
|
||||||||
129 | PT. SYARIF MAJU KARYA - 03.289.357.0-009.000 | |
|
||||||||
130 | PT. RADAR JAYA PERKASA ABADI - 02.326.650.5-501.000 | |
|
||||||||
131 | CV. MERBABU ASSRI - 03.312.418.1-505.000 | |
|
||||||||
132 | PT. JAYA BETON INDONESIA - 01.143.292.9-038.000 | |
|
||||||||
133 | Cipta Pirmindo Abadi - 01.363.171.8-075.000 | |
|
||||||||
134 | PT. BUMI PANEN MAKMUR - 66.313.927.7-517.000 | |
|
||||||||
135 | PT. BANGUN MAKMUR UTAMA - 01.106.699.0-511.000 | |
|
||||||||
136 | PT INDO TRANS KONSTRUKSI - 85.836.791.5-407.000 | |
|
||||||||
137 | PT. VALENTARA SARANA RAYA - 73.450.922.7-517.000 | |
|
||||||||
138 | PT. JAYA SEMPURNA SAKTI - 02.699.348.5-532.000 | |
|
||||||||
139 | PT AHZA PUTRA MAILANIK - 80.960.515.7-531.000 | |
|
||||||||
140 | PT. BAGASKARA PRATALA MANUNGGAL - 72.159.497.6-525.000 | |
|
||||||||
141 | PT HEFA SARANA KONTRAKTOR - 31.693.742.4-528.000 | |
|
||||||||
142 | PT. RATTAN PRIYA TANAYA - 72.213.636.3-525.000 | |
|
||||||||
143 | CV. PUTRA NUGRAHA - 01.910.477.7-514.000 | |
|
||||||||
144 | CV. RAGA CIPTA PERSADA - 02.869.855.3-402.000 | |
|
||||||||
145 | PT.ARIES - 02.304.252.6-528.000 | |
|
||||||||
146 | PT.KARYA BHAKTI - 01.207.755.8-528.000 | |
|
||||||||
147 | cv.gajahtunggal - 02.044.096.2-505.000 | |
|
||||||||
148 | PT. SELO KENCONO PUTRA PERSADA - 01.627.600.8-523.000 | |
|
||||||||
149 | CV. MAHARANI PUTRI GEMILANG - 31.707.581.0-506.000 | |
|
||||||||
150 | CV. PILAR 33 - 21.120.759.2-501.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak